Electric Vehicle Energy Management System (EV EMS)

Pilot Objective

To test the ability of EV EMS software demand monitoring and load control technologies to regulate the capacity of an (L2) electric vehicle (EV) charger to ensure the maximum load of the EV supply equipment (EVSE) does not exceed the available capacity of the home’s main circuit panel.

Pilot Status

This pilot is in the final contracting stages and is anticipated to begin preparatory deployment activities in December 2024.

Schedule

BE Pilot

Lead Vendor

Partners

Intent to Bid

RFP Issued

Proposals Due

Award Date

Pilot Launch

Pilot End Date

EV EMS

WeaveGrid

Emporia, SWTCH, Treehouse

March 15

June 4

July 1

Q3/2024

Q1/2025

Q3/2025