The Final Order in ComEd’s Beneficial Electrification Plan (“BE Plan”) proceeding, Illinois Commerce Commission (“Commission” or “ICC”) Docket Nos.22-0432 and 22-0442, Cons., dated March 23, 2023, and Amended May 8, 2023 (“Final Order”), specifies a budget of $77 million annually over the three-year period of the BE Plan, 2023 through 2025.  Of this $77 million total, the Commission allocated $5 million annually to implement eight pilot programs, referred to collectively as the BE Pilots.

June 25, 2024 BE Pilot Update:

BE Pilot

Intent to Bid

RFP Issued

Proposals Due

Bidder Presentations

Award Date

Pilot Launch

Curbside Charging Construction

March 15

May 7

June 21

None

July 26

Q4/2024

Curbside Charging Design and PM

May 17

June 12

None

July 26

Q4/2024

Curbside Charging Equipment

August 2

September 6

September 17 – 19

October 3

Q4/2024

Rideshare

May 16

June 18

None

July 26

Q4/2024

Air Quality Monitoring

June 12

July 16

None

August 9

Q4/2024

School Bus V2G Operator

May 9

June 17

July 23-26

July 23

Q4/2024

School Bus V2G Evaluator

May 17

June 14

August 5-9

July 23

Q4/2024

Backup Power Capabilities

July

TBD

TBD

TBD

TBD

Air Quality, Backup Power, Curbside, and Rideshare Evaluator

May 30

July 1

July 15-16

July 26

Q3/2024

Residential Optimized Charging

June 4

July 8

August 13-14

August 23

Q4/2024

Sub-Metering

June 4

July 9

July 30-31

August 14

Q4/2024

EV EMS

June 4

July 1

July 24-25

August 9

Q4/2024

Please note, the BE Pilot timeline above is subject to change.

BE Pilots

Visit the links below for more background on each of the eight pilots.

Air Quality Monitoring

Backup Power Capabilities

Curbside Charging

EV Energy Management System (EMS)

Residential Optimized Charging

Rideshare

School Bus Vehicle To Grid

Submetering

July 25, 2023:

Pursuant to the Final Order, ComEd is required to determine an evaluation process and criteria for reviewing and scoring BE Pilot ideas and proposals. Id. at 87.

The BE Pilot Evaluation Process and Criteria document, linked below, outlines the process and criteria that will be used for pre-screening, reviewing requests for information (“RFIs”), reviewing requests for proposals (“RFPs”), and assessing BE Pilot success. More information on BE Pilots, as well as RFI information, will be posted here as it becomes available.